Dust Suppression Case Study

Dust-A-Side have designed, installed, commissioned and are currently fine-tuning a dust suppression system at a mine site preparation plant* in Australia.

This customised and purpose-built system has resulted in a 78% reduction of respirable sized dust at the site.

To read about how this system solved the unique challenges posed by the mine site, simply fill out the form to download our detailed case study.

*Clients’ name has been withheld to protect privacy

Our-customised-system-reduced-Mockup

 

Download your copy